Concrete takeoffs

Concrete volumes and reinforcement, measured by element.

Send your concrete plans. Get a CSI-coded, Excel-ready quantity schedule — measured from the drawings, with ambiguities flagged for review.

Vector PDF or DWG only · 6 measured item types · Fixed pricing below

At a glance

What’s included in concrete.

  • Footings by typeCY
  • Slabs on grade and suspended slabsCY / SF
  • Walls and columnsCY
  • Reinforcing steelLB / EA
  • Forming and accessoriesSF
  • Finishing and jointsLF / SF
Simple, project-based pricing

Fixed per project. No subscription.

Pick the tier that fits this plan set. Concrete can be scoped as one trade or included in a multi-trade schedule.

One Trade
$49fixed / project

One trade on this plan set, with a clear, Excel-ready quantity schedule.

  • AI-assisted quantity takeoff
  • CSI-coded line items and units
  • Ambiguities flagged for review
Choose One Trade

No surprises.

Multi-Trade + Review
$249fixed / project

Multi-trade takeoff plus review by an estimating professional.

  • Everything in Multi-Trade
  • Quantity, unit, scope checks
  • Flagged details reviewed
Choose Multi-Trade + Review

No surprises.

All prices in USD. Fixed per project — no per-seat licences, no custom quotes. See a real schedule.

Common misses

Handled or flagged.

  • Volume measured without the thickened edges: Thickened slab edges and footings under walls add concrete that a flat slab measurement misses. We measure these as their own elements from the structural details, not as an allowance on the slab.
  • Rebar left out of the concrete scope: Reinforcing is often on its own sheet and its own specification section. A volume takeoff that stops at concrete leaves out the steel. We pull reinforcement from the schedule and detail sheets alongside the volumes.
  • Forming counted as concrete: Formwork is priced by area, not volume. Mixing the two produces a number that is right in neither unit. We keep forming as a separate line measured from the element faces.
FAQ

Quick answers.

Do you measure footings separately from slabs?
Yes. Footings, slabs, walls, and columns are separate lines, grouped by level. That is how a concrete subcontractor usually pours and prices the work.
Do you include rebar?
Reinforcing is measured from the schedules and details where they are in the plan set. The steel is shown by bar size and length so it can be ordered and priced.
Can you measure exterior flatwork?
Yes, when the site plan and paving details are included. Sidewalks, drives, and pads are measured by area and thickness and kept separate from the building slabs.
Do you check the volumes against the structural engineer's notes?
The schedule measures what the drawings show, and it flags any element whose dimensions conflict with the notes. Structural design and the final pour requirements stay with the engineer of record.
Ready when you are

Send concrete plans.

Upload vector PDF or DWG files. We’ll confirm scope before you pay for review. See pricing.

Send concrete plans