Decking takeoffs

Deck boards, framing, and fasteners, counted by span.

Send your decking plans. Get a CSI-coded, Excel-ready quantity schedule — measured from the drawings, with ambiguities flagged for review.

Vector PDF or DWG only · 7 measured item types · Fixed pricing below

At a glance

What’s included in decking.

  • Decking boards by areaSF / LF
  • Joists by size and spacingEA / LF
  • Beams and girdersLF / EA
  • Posts and footingsEA
  • Ledger and flashingLF
  • Stairs and railingsEA / LF
  • Hardware and fastenersEA
Simple, project-based pricing

Fixed per project. No subscription.

Pick the tier that fits this plan set. Decking can be scoped as one trade or included in a multi-trade schedule.

One Trade
$49fixed / project

One trade on this plan set, with a clear, Excel-ready quantity schedule.

  • AI-assisted quantity takeoff
  • CSI-coded line items and units
  • Ambiguities flagged for review
Choose One Trade

No surprises.

Multi-Trade + Review
$249fixed / project

Multi-trade takeoff plus review by an estimating professional.

  • Everything in Multi-Trade
  • Quantity, unit, scope checks
  • Flagged details reviewed
Choose Multi-Trade + Review

No surprises.

All prices in USD. Fixed per project — no per-seat licences, no custom quotes. See a real schedule.

Common misses

Handled or flagged.

  • Board waste not shown: Boards are sold in fixed lengths, and diagonal or border patterns waste more than straight runs. A flat percentage hides that. We show the surface area and the waste line separately so the order can be checked against the layout.
  • Ledger and its connections left out: The ledger attaches the deck to the house. It needs flashing, a fastener schedule for vertical load, and a separate lateral-load connection, usually rated hardware (IRC R507.9.2). Those are often on the connection detail, not the deck plan. Missing them leaves the bid short on structure. We flag the ledger whenever a house connection is shown.
  • Joist spacing that does not match the boards: Board direction and joist spacing have to work together. A deck plan that shows one spacing and a framing plan that shows another will give a short count of boards or joists. We check both against the same deck area.
FAQ

Quick answers.

Do you include waste on the boards?
The board area is shown on its own line and the waste is calculated as a separate line, so you can see the difference and apply the rule your supplier uses.
Can you measure a deck with stairs and railing?
Yes, when the stair and railing details are part of the plan set. Stairs and railings are kept as separate lines from the deck surface.
Do you count footings and posts?
Yes. Posts and footings are counted from the framing plan and the section. Footing concrete is shown in the concrete line so it can be priced with the rest of the foundation.
Do you check the framing spans?
No. The schedule measures what the framing plan shows. Span tables, load design, and code requirements stay with the engineer or the authority having jurisdiction.
Ready when you are

Send decking plans.

Upload vector PDF or DWG files. We’ll confirm scope before you pay for review. See pricing.

Send decking plans