Flooring takeoffs

Finish flooring by room, with base and transitions.

Send your flooring plans. Get a CSI-coded, Excel-ready quantity schedule — measured from the drawings, with ambiguities flagged for review.

Vector PDF or DWG only · 6 measured item types · Fixed pricing below

At a glance

What’s included in flooring.

  • Flooring area by finish typeSF
  • Tile and stone by size and patternSF
  • Base and wall trimLF
  • Transitions and thresholdsLF / EA
  • Underlayment and preparationSF
  • Stair treads and risersEA / LF
Simple, project-based pricing

Fixed per project. No subscription.

Pick the tier that fits this plan set. Flooring can be scoped as one trade or included in a multi-trade schedule.

One Trade
$49fixed / project

One trade on this plan set, with a clear, Excel-ready quantity schedule.

  • AI-assisted quantity takeoff
  • CSI-coded line items and units
  • Ambiguities flagged for review
Choose One Trade

No surprises.

Multi-Trade + Review
$249fixed / project

Multi-trade takeoff plus review by an estimating professional.

  • Everything in Multi-Trade
  • Quantity, unit, scope checks
  • Flagged details reviewed
Choose Multi-Trade + Review

No surprises.

All prices in USD. Fixed per project — no per-seat licences, no custom quotes. See a real schedule.

Common misses

Handled or flagged.

  • Waste that is not explained: A flat waste percentage on every room hides where the waste actually comes from. Published flooring guides commonly use about 5 to 10 percent for straight lay, about 15 percent for diagonal, and 15 to 20 percent for herringbone, and those figures move with room shape and product. We show the net area and the waste line separately so the order can be checked against the layout.
  • Base missed at door openings: Base is measured along walls, so it stops at each door. Some plans show base that runs through the door, and others do not. We take the base from the finish schedule and flag any opening where the base treatment is not clear.
  • Transitions left out of the room count: Each change of finish needs a transition, and each transition has a length. They are small on each room and easy to forget across a whole floor. We count them from the finish plan at every line where two finishes meet.
FAQ

Quick answers.

Do you include waste and cut allowance?
Area is measured from the finish plan and shown separately from any allowance, so you can apply the waste rule your supplier and installer use. The schedule does not hide a waste percentage inside the area.
Do you measure base by room?
Base is measured along the wall lines of each room and grouped by finish and floor. Door openings are netted from the base length where the plans dimension them.
Can you handle tile layouts?
Tile is counted by size and pattern where the layout is shown. Cuts at room edges are shown as their own line, so the tile count can be checked against the layout drawing.
Are underlayment and preparation included?
They are included where the specification sections are part of the plan set. Otherwise they are flagged as outside the flooring scope so they can be confirmed.
Ready when you are

Send flooring plans.

Upload vector PDF or DWG files. We’ll confirm scope before you pay for review. See pricing.

Send flooring plans