HVAC takeoffs

Ductwork, equipment, and terminals, counted by system.

Send your hvac plans. Get a CSI-coded, Excel-ready quantity schedule — measured from the drawings, with ambiguities flagged for review.

Vector PDF or DWG only · 7 measured item types · Fixed pricing below

At a glance

What’s included in hvac.

  • Supply, return, and exhaust ductworkLF / SF
  • Duct fittings and transitionsEA
  • Diffusers, registers, and grillesEA
  • Air handlers, rooftop units, and fan coilsEA
  • Dampers and air devicesEA
  • Duct and pipe insulationSF / LF
  • Controls and thermostatsEA
Simple, project-based pricing

Fixed per project. No subscription.

Pick the tier that fits this plan set. HVAC can be scoped as one trade or included in a multi-trade schedule.

One Trade
$49fixed / project

One trade on this plan set, with a clear, Excel-ready quantity schedule.

  • AI-assisted quantity takeoff
  • CSI-coded line items and units
  • Ambiguities flagged for review
Choose One Trade

No surprises.

Multi-Trade + Review
$249fixed / project

Multi-trade takeoff plus review by an estimating professional.

  • Everything in Multi-Trade
  • Quantity, unit, scope checks
  • Flagged details reviewed
Choose Multi-Trade + Review

No surprises.

All prices in USD. Fixed per project — no per-seat licences, no custom quotes. See a real schedule.

Common misses

Handled or flagged.

  • Duct fittings allowed instead of measured: A common shortcut is to add a percentage to the straight duct for fittings. Published estimating guides use roughly 25 to 40 percent, and the figure swings with how congested the mechanical room is. On a complex run the allowance can be far off. We count the elbows, tees, and transitions on the routed paths so the allowance is visible.
  • Lined duct and sizes that do not match: Lined duct is often drawn at its clear inside size, so the sheet metal has to be larger. Size changes between the schedule and the plan are easy to miss as well. We reconcile size, lining, and length across both sheets before we total the sheet metal.
  • Terminals counted from the wrong ceiling: Diffusers appear on the reflected ceiling plan, which can differ from the floor plan. A count from the floor plan can add or drop terminals. We take terminals from the reflected ceiling plan and the room schedule.
FAQ

Quick answers.

Do you measure duct by the sheet metal area or the length?
Both are shown. Rectangular and round duct is measured in length by cross-section or diameter, and the surface area is calculated from that, so the sheet metal estimate and the duct length can be checked against each other.
Do you separate systems?
Yes. The schedule is grouped by air handler, rooftop unit, or zone, so each system can be checked and priced on its own.
Do you include controls?
Controls are included where the sequence and control drawings are part of the plan set. Thermostats and control points are counted by type, and the controls scope is confirmed at review.
Does this check the equipment sizing?
No. The schedule measures what the drawings show. Load calculations, equipment sizing, and code compliance stay with the mechanical engineer of record.