Plumbing takeoffs

Plumbing pipe, fixtures, and equipment, counted by riser.

Send your plumbing plans. Get a CSI-coded, Excel-ready quantity schedule — measured from the drawings, with ambiguities flagged for review.

Vector PDF or DWG only · 7 measured item types · Fixed pricing below

At a glance

What’s included in plumbing.

  • Domestic water piping by size and materialLF
  • Waste and vent pipingLF
  • Fittings and transitionsEA
  • Plumbing fixturesEA
  • Water heaters and boilersEA
  • Valves and specialtiesEA
  • Insulation on hot water and cold linesLF
Simple, project-based pricing

Fixed per project. No subscription.

Pick the tier that fits this plan set. Plumbing can be scoped as one trade or included in a multi-trade schedule.

One Trade
$49fixed / project

One trade on this plan set, with a clear, Excel-ready quantity schedule.

  • AI-assisted quantity takeoff
  • CSI-coded line items and units
  • Ambiguities flagged for review
Choose One Trade

No surprises.

Multi-Trade + Review
$249fixed / project

Multi-trade takeoff plus review by an estimating professional.

  • Everything in Multi-Trade
  • Quantity, unit, scope checks
  • Flagged details reviewed
Choose Multi-Trade + Review

No surprises.

All prices in USD. Fixed per project — no per-seat licences, no custom quotes. See a real schedule.

Common misses

Handled or flagged.

  • Pipe measured on the plan, not the riser: Floor plans show horizontal runs. Vertical risers and drops do not show clearly on them, so pipe measured from the plan alone is short. We pull vertical lengths from the riser diagram and add them to the horizontal runs.
  • Fittings allowed instead of counted: A percentage allowance on each line is a common shortcut. Published estimating guides use roughly 30 to 50 percent, and the figure depends on how many bends and tees the run has. On a multi-floor job it can be far off. We count fittings from the routed runs so the allowance is visible and can be checked.
  • Hot and cold lines priced as one: Energy codes often require insulation on recirculating hot water lines and on the first feet of hot outlet piping, while cold lines usually do not need it. Pricing both as one line misses the insulation and any material difference. We keep hot and cold separate and show where the code or the specification calls for insulation.
FAQ

Quick answers.

Do you measure risers as well as horizontal runs?
Yes. Vertical risers and drops are taken from the riser diagram and added to the horizontal runs on the plans. That is where most plan-only takeoffs come up short.
Do you count fittings?
Fittings are counted from the routed runs and shown as their own lines. That makes the fitting allowance visible, so you can check it against your own experience and your supplier's counts.
Can you separate hot and cold water?
Yes. Hot and cold lines are separate, with insulation shown where the specifications call for it.
Does this include gas piping?
Only where the plans show it as part of the scope. Gas, medical gas, and other specialty systems should be sent as separate plan sets or confirmed at scoping, so the lines are not mixed into the water and waste count.
Ready when you are

Send plumbing plans.

Upload vector PDF or DWG files. We’ll confirm scope before you pay for review. See pricing.

Send plumbing plans